Murfreesboro City Construction Projects for October 8 through October 14

0
648

Beasie Rd Extension (River Rock Blvd just north of Racquet Club Dr)

Expected Lane Closures:   Monday Through Friday:  Riverrock Blvd will be reduced to one-lane flagging operation at Beasie Rd for waterline installation work.  Road and bridge construction work over Stones River Greenway continues.  The greenway trail will be closed around the existing Beasie Rd area until further notice due to bridge construction work over the greenway trail.  There will be no through trail access between the Old Fort Park and Cason Trailhead.  Appropriate traffic controls will be in place.

Elam Rd Re-Alignment Project (Joe B Jackson Pkwy just east of I-24 Interchange)

Expected No Road Closures:   Monday through Friday:  Contractor for a private development will be doing new road construction work along Elam Rd and Joe B Jackson Pkwy.  There will be no street closures.  There will be minor traffic interruptions from construction vehicles entering and exiting along Elam Rd and Joe B Jackson Pkwy.  Appropriate traffic controls and will be in place.

Ramp Improvement, Lighting and Signalization Project (I-840 and Veterans Pkwy Interchange)

Expected Lane Closures:   Monday through Friday:  Contractor for TDOT will be making ramp improvements, installing streetlights and traffic signals at I-840 and Veterans Pkwy.  There will be traffic interruptions and intermittent lane closures from construction activities.  Appropriate traffic controls and will be in place.

Signalization Project (Veterans Pkwy at Westlawn Blvd)

Expected Lane Closures:   Monday through Friday:  Contractor for a private development will be installing a traffic signal at Veterans Pkwy and Westlawn Blvd.  There will be minor traffic interruptions and intermittent lane closures from construction activities.  Appropriate traffic controls and will be in place.

NW Broad St Turn Lane Improvements and Paving Work (between Overall Creek Bridge and Singer Rd )

Expected Lane Closures:  Monday through Friday, 8:30 am – 3:30 pm:  Contractor for a private development will be performing incidental pavement marking and cleanup work along NW Broad St between Overall Creek Bridge and Singer Rd.  There will be minor traffic interruptions on NW Broad St.  Appropriate traffic controls will be in place.

Annual City Street Paving

Expected Lane Closures:  Monday through Friday, 9:00 AM – 3:00 PM:  City contractor will be performing construction work at the following streets:

1.    Middle Tennessee Blvd between MLK and S E Broad St (paving and striping work)

2.    Medical Center Pkwy EB between I-24 and Thompson Ln (roadway improvements)

Expect lane shifts and traffic interruptions.  Appropriate traffic controls will be in place.

TDOT Resurfacing Projects

(Source: TDOT)

DAVIDSON / RUTHERFORD COUNTY 1-24

The construction of an Intelligent Transportation System and operational upgrades from Nashville to Murfreesboro on I-24 from I-440 to U.S. 231 (S.R. 10)

•    10/8, 5 a.m. – 8 a.m., There will be lane closure and rolling roadblocks on I-24 to reinstall Lane Control Gantry 1 at MM 54. Rolling road blocks will extend on I-440 and I-40 as well.

RUTHERFORD COUNTY I-840

The resurfacing of I-840 from the West Fork Stones River Bridge to near Exit 61

•    Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on I-840 for pavement markings.

RUTHERFORD COUNTY SR 10

The resurfacing on S.R. 10 from the Bedford County line (L.M. 0.00) to S.R. 269 East. (L.M. 4.29)

•    Nightly, 8 p.m. – 4 a.m., There will be temporary lane closures for installation of epoxy overlay at bridge over Dry Fork Creek.

RUTHERFORD COUNTY SR 96

The resurfacing on SR-96 from Carol Drive (L.M. 6.45) to near I-24 (L.M. 9.5)

•    Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on SR-96 for pavement markings.

The resurfacing on SR-96 from Compton Road (16.73) to Cainsville Pike (20.50)

•    Daily, 9 a.m. – 3 p.m., There will be flagging operations for resurfacing activites.

RUTHERFORD COUNTY SR 99

The grading, drainage, construction of retaining walls, signals and paving on SR-99 (New Salem Hwy) from near I-24 to SR-96 (Old Fort Pkwy)

•    Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on Middle TN Blvd for waterline installation.

RUTHERFORD COUNTY SR 266

The grading, drainage, construction of two concrete bulb tee beam bridges, signals, and paving on SR-266 (Jefferson Pike) from SR-102 (LM 5.0) to E. of I-840 (LM 9).

•    Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.

The removal of Portland Cement Concrete and repaving on SR-266 at the intersection of Weakley Lane and SR-102

•    10/6 – 10/9 at 8 p.m. – 5 a.m., continuous, There will be lane closures in both directions to shift traffic to replace concrete pavement with asphalt.  One lane in each direction will remain open.