RUTHERFORD COUNTY, Construction of a New Interchange on SR 1 at SR 10 (Broad St.) and SR 96

* Thursday April 28 through Wednesday May 4, 8 PM – 6 AM, There will be alternating lane closures on SR-1 and SR-96 for potential construction activities. One lane will remain open in each direction. The closure of Broadmor Boulevard will continue this week.

RUTHERFORD COUNTY, Resurfacing I-24 from Stones River Bridge (MM 78.5) to East of the Bridge over CSX Railroad (MM 82)

* Friday April 29, 8PM through Monday April 25, 5AM, There will be a ramp closure on I-24 westbound at exit ramp 81 (from I-24 westbound onto Church Street) for the removal and replacement of concrete pavement. Advanced warning signs and a detour will be in place. One lane of northbound Church Street (Hwy 231) will also be closed in conjunction with the ramp closure to allow for tie-in. Two lanes will remain open on Northbound Church Street (Hwy 231).

* (Alternate) Friday April 29 at 8PM through Monday May 2 at 5AM, There will be a ramp closure on I-24 EB Exit Ramp 81B (from I-24 EB onto Church Street) for removal and replacement of concrete pavement. Advanced warning signs and a detour will be in place. This alternate request will only be implemented if inclement weather prohibits work on WB exit ramp 81.

RUTHERFORD COUNTY, Grading, Drainage and Paving on SIA Route Serving Nissan North America

* From now through August 2016, Singer Road, from North Broad Street to the Nissan North America entrance, will be closed to through traffic. This closure will remain in place until the project has been completed or until 8/31/16. Local business access within the project limits will be provided.

RUTHERFORD COUNTY, Performance Based Maintenance Work on I-24, I-65, and SR 840

* Monday May 2 through Wednesday May 4, 9AM to 3PM, There will be alternating lane closures on I-840 in both directions between MM 55.6 to MM 57 and MM 60.4 to MM 63.6 for asphalt repair and patching. One lane will remain open.

Murfreesboro

Bridge over Broad Street TDOT Project

Expected Lane Closures: Monday through Friday, 8:00 pm to 6:00 am: There will be alternating lane closures on NW Broad Street, Ridgley Road and W College Street for underground utility crossing. There will be lane shifts and traffic interruptions. Broadmor Blvd is closed to through traffic for utility crossing and general construction work.  W Lytle Street and a short segment of College St and Burton St are also closed to traffic for construction work. Retaining wall work continues as part of the southwest and southeast ramps for the new overpass.  Appropriate traffic controls will be in place.

Sewer Pump Station Project (NW Broad St at Battlefield Pkwy)

Expected Lane Closures: Monday through Friday, 6:00 am to 5 pm: Contractor for Water & Sewer Department will be installing sewer lines within TDOT right-of-way/Battlefield Pkwy. A small section of Battlefield Pkwy is closed. Underground bore work continues. Appropriate traffic controls will be in-place.

W Lytle Street Relocation Project (NW Broad St to Barker St)

Expected Lane Closures: Monday through Friday, 8:00 pm to 6:00 am: W Lytle Street is also closed to traffic at NW Broad Street for construction work.  Underground utility work continues.  Appropriate traffic controls will be in place.

Middle Tennessee Widening Project (Greenland Dr to E Main St)

Expected Lane Closures: Monday through Friday:  The contractor has implemented the next phase of the traffic control plan on Middle Tennessee Blvd.  Traffic on Middle Tennessee Blvd has been shifted to the east side and reduced to two lanes between E Main St and Greenland Dr (near the tennis courts).  E Lytle St is closed at Middle Tennessee Blvd.  The section of E Lytle St between N Bilbro Ave and Middle Tennessee Blvd are only open to local traffic.  Appropriate traffic controls and detours signs will be in place.

Murfreesboro Water & Sewer Rehabilitation Work

1) Haynes Dr between 210 – 422 Haynes Dr – 5/4 to 5/5
2) Ridgley Rd between 307 – 317 Ridgley Rd – 5/3
3) Poplar Ave between 706 – 707 Ridgley Rd – 5/3

Expected Lane Closures: Monday through Friday, 9:00 am to 3:00 pm: The contractor for Water & Sewer Department will be performing manhole rehabilitation/repairs of the sewer lines. Traffic will be reduced to one lane flagging operation. Appropriate traffic controls will be in place.

TDOT Roadway Improvement Project (Singer Road between NW Broad St and CSX Railroad)

Expected Lane Closures: Monday, March 14 – Wednesday, August 31:  The contractor for TDOT will be closing Singer Rd between NW Broad St and CSX Tracks to make roadway improvements.  Access to and from businesses and residents will be from Florence Road.  Appropriate traffic controls will be in place.

Private Development Roadway Improvement Work (Veterans Pkwy just north of Old Fort Pkwy)

Expected Minor Lane Closures: Monday through Friday, 9:00 am to 3:00 pm:  Contractor for a private development will be performing roadway improvement on Veterans Pkwy just north of Old Fort Pkwy.  There will be lane closures and traffic interruptions.  Appropriate traffic controls will be in place.

New Sewer Service Installation Work (Hickerson Dr between W Castle St and S Front St)

Expected Lane Closures: Monday through Friday, 8:30 am to 2:30 pm:  Contractor for a private development will be installing sewer service on Hickerson Dr.  There will be minor traffic interruptions.  Appropriate traffic controls will be in place.

Rutherford County Judicial Center Project (Burton St/Church St)

Expected Lane Closures: Tuesday, 8:00 am to 3:00 pm: Construction crews will be removing a tree on Burton St between Maple St and Church St.  There will be lane closures and traffic interruptions.  Appropriate traffic controls and detours will be in place.

Private Development Paving and Striping Project (E Main St between Baird Ln and College Heights St)

Expected Lane Closures:  Monday & Tuesday, 9:00 am to 3:00 pm:  Contractor for a private development will be paving and striping E Main St between Baird Ln and College Heights St.  Traffic on E Main St will be reduced to one-lane flagging operation.  There will be lane closures and traffic interruptions.  Appropriate traffic controls will be in-place.

Comcast Underground Fiber Installation Project (Asbury Rd at Florence Rd)

Expected No Lane Closures:  Tuesday, 8:00 am to 5:00 pm:  Contractor for Comcast will be installing underground fiber optic lines along Asbury Rd just west of Florence Rd.  Traffic on Asbury Rd and Florence Rd will be affected by this operation.  There will be no lane closures and traffic interruptions.  Appropriate traffic controls will be in-place.

Private Development New Entrance Driveway Work (909 N Thompson Ln – just south of Gateway Blvd)

Expected Lane Closures:  Monday & Tuesday, 9:00 am to 12:00 pm:  Contractor for a private development will be installing a new driveway entrance onto N Thompson Ln just south of Gateway Blvd.  Southbound traffic on Thompson Ln will be reduced from two lanes to one lane through the work area.  There will be lane closures and traffic interruptions.  Northbound traffic will not be affected.  Appropriate traffic controls will be in-place.

Private Development Roadway Improvements Work (Joe B Jackson Pkwy across from Elam Farms Pkwy)

Expected Lane Closures:  Monday & Tuesday, 9:00 am to 3:00 pm:  Contractor for a private development will be installing a new street entrance and turn lane on Joe B Jackson Pkwy across from Elam Farms Pkwy.  Eastbound traffic on Joe B Jackson Pkwy will be reduced from two lanes to one lane through the work area.  There will be lane closures and traffic interruptions.  Westbound traffic will not be affected.  Appropriate traffic controls will be in-place.

Asplundh Tree Trimming Work (Rutherford Blvd between Gold Valley Dr and Greenland Dr)

Expected Lane Closures:  Tuesday through Thursday, Weather Permitting, 8:30 am to 2:30 pm:  Asplundh Tree Trimming crews will be trimming trees on the west side of Rutherford Blvd between Gold Valley Dr and Greenland Dr.  Southbound traffic will be reduced from two lanes to one lane in the work area.  Northbound traffic will not be affected.  Appropriate traffic controls will be in place.

City of Murfreesboro Traffic Signal Maintenance Work (Broad Street between Mercury Blvd and Florence Rd)

Expected Lane Closures:  Monday through Thursday, Weather Permitting, 8:00 pm to 6:00 pm:  City Traffic Signal Contractor will be performing maintenance work on the traffic signals along Broad Street between Mercury Blvd and Florence Rd.  There will be minor lane closures and traffic interruptions.  All work will be done at night.  Appropriate traffic controls will be in place.

Annual City Street Paving Project

Expected Lane Closures:  Monday through Friday, 9:00 AM – 3:00 PM:  City paving contractor will be milling/paving the following streets:  Avenal Ct, Crown Hill Dr, Northwoods Cove, Henry Hall, Victoria Dr, Cornwall Ct, Leeds Ct, Rye Ct, Langtry Ct, Fairfax Dr, Flower Park, Jackson Rd & General Kirk Dr.  There will be lane closures and traffic interruptions.  Appropriate traffic controls will be in-place.