Lane Closures and Road Construction 6-9-14-2023

0
998

FOR YOUR CLOSE TO HOME TRAFFIC FIND YOUR LOCATION HERE

MIDDLE TENNESSEE SCHEDULED LANE CLOSURES

June 8 – 14, 2023

To subscribe to the TDOT-REGION-3-LANE-CLOSURES list, send an email to [email protected]
and type subscribe TDOT-REGION-3-LANE-CLOSURES in the message body.
To unsubscribe from the TDOT-REGION-3-LANE-CLOSURES list, send an email to [email protected]
and type unsubscribe TDOT-REGION-3-LANE-CLOSURES in the message body.
NOTE: All lane closures listed below are reflective of necessary adjustments due to the CMA Fest this weekend
and the beginning of Bonnaroo next week.
DAVIDSON / RUTHERFORD COUNTIES I-24
The installation of Smartway Intelligent Transportation System (ITS) on I-24 from I-440 to US-231
 6/12 – 6/14, 8 P.M. – 5 A.M., There will be alternating lane closures EB and WB for guardrail
installation.
RUTHERFORD COUNTY I-24
On-Call Pavement Testing
 6/8, 8 p.m. – 5 a.m., There will be Left and HOV Lane Closures for pavement testing (MM 78 – 82)
The resurfacing on I-24 from E of Epps Mill Road through Bedford County to the Coffee County Line.
 Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures EB and WB for milling and paving
activities Thurs. – Mon. and WB only on Tues. and Wed. (MM 90-97)
DAVIDSON COUNTY I-40
The resurfacing on I-40 from U.S. 70S (S.R.1) (L.M. 4.71) to near U.S. 70 (S.R. 24, Charlotte Pike) (l.M.
9.61)
 Nightly, 8 p.m. – 5 a.m., There will be multiple alternating lane and ramp closures for the
installation of construction signs and degrassing operations.
The grading, drainage, construction of bridges, retaining walls and paving on I-40 (MM 216) at the
Donelson Pike interchange
 6/8 – 6/-13, 8 p.m. – 4 a.m., There will be rolling roadblocks on I-40 in both directions and brief
closures of the on ramp from Donelson Pk to I-40 WB for crossing of utility strand wire and fiber.
DICKSON / WILLIAMSON / CHEATHAM / DAVIDSON COUNTIES I-40
The expansion of the SmartWay Intelligent Transportation System (ITS) on I-40 from near I-840 in
Dickson County to near U.S. 70S (Exit 196) in Davidson County
 Daily, 7:30 a.m. – 6 p.m., There will be temporary daytime shoulder closure in both directions for
trenching and boring operations at various locations throughout the project limits.
 Nightly, 8 p.m. – 5 a.m., There will be temporary nighttime lane closure to remove guardrail, set

TDOT Region 3 • 6601 Centennial Boulevard • Nashville, Tennessee 37243
Tel: 615-741-7446 • Cell: 615-961-6717 • Email: [email protected]
barrier rail, and install an attenuator at each location listed.
o MM 190-192
o MM191-193
o MM193-196
o MM192-196
HUMPHREYS / HICKMAN COUNTIES
The resurfacing of I-40 in Humphreys and Hickman County from MM 134.75 to MM 149.5
 Nightly, 8 p.m. – 5 a.m., There will be temporary nighttime lane closures in the EB direction for
milling and paving operations. (MM 135 – 141)
 LOOK AHEAD: 6/23 – 6/26 & 7/7 – 7/10, continuously from 7 p.m. Fri. until 5 a.m. Mon., There
will be continuous weekend closures for bridge deck repairs and expansion joint replacements in
both directions.
WILSON COUNTY I-40
The resurfacing on I-40 from South Hartman to the Smith County Line
 Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on I-40 EB and WB from the Sparta
Pike exit to Smith Co. Line For resurfacing activities on I-40
SMITH COUNTY I-40
The resurfacing on I-40 from the Smith County to the Gordonsville exit
 Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on I-40 EB and WB from the Sparta
Pike exit to Smith Co. Line For resurfacing activities on I-40
DAVIDSON COUNTY I-440
The installation of an overhead sign structure on I-440 WB at the I-65 ramp (L.M. 5.2)
 Daily, 9 a.m. – 3 p.m., There will be alternating shoulder closures on I-440 WB at Exit 5 to I-65 to
begin foundation work (MM4.5)
DAVIDSON COUNTY I-65
The random on-call pavement markings on various interstates and state routes.
 6/12 – 6/14, 8 p.m. – 5 a.m., There will be nighttime lane closure for detail striping items along I-65
NB and SB. Lane closures will be required in each direction for the installation of HOV diamonds.
GILES COUNTY I-65
The resurfacing on I-65 from the Alabama state line to south of U.S. 64 (S.R. 15) including thin epoxy
overlay on the bridge over S.R. 273
 Nightly, 6 p.m. – 6 a.m., Alternating NB & SB lane closures for milling and paving. One lane will
remain open at all times. MM 0 – 13
DAVIDSON COUNTY I-65 / SR 254
The grading, drainage, construction of a retaining wall, signals and paving on I-65 at the NB exit
ramp to SR 254 (OHB, Exit 74A)
 Daily, 9 a.m. – 3 p.m. and 8 p.m. – 5 a.m., There will be temporary lane closures on SR 254 (OHB)
in both directions for grading and signal work. Two lanes will remain open in each direction.

TDOT Region 3 • 6601 Centennial Boulevard • Nashville, Tennessee 37243
Tel: 615-741-7446 • Cell: 615-961-6717 • Email: [email protected]
ROBERTSON COUNTY I-65
Interstate Widening – Grading, drainage, construction of bridges and retaining walls, ITS and paving
 Nightly, 8 p.m. – 5 a.m. There will be temporary lane closures on I-65 NB and SB for roadway
maintenance, one lane will always remain open.
Installation of Overhead Sign Structure
 Daily, 9 a.m. – 4 p.m. – continuous There will be continuous inside shoulder closures NB and SB
with barrier rail. Daytime closure for the NB outside shoulder. All lanes will remain open.
WILLIAMSON COUNTY I-65
On-Call Pavement Testing
 6/12, 8 p.m. – 5 a.m., Temporary Lane Closures for pavement testing at MM 58-62 and MM52-58.
RUTHERFORD COUNTY I-840
The resurfacing of I-840 from West Fork Stones River Bridge to near SR-266
 Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures on I-840 for milling and paving
operations. One lane will remain open at all times.
The on-call concrete pavement repair at various locations on various Interstate and State Routes
 6/11 at 8 p.m. continuously until 6/14 at 12 p.m., There will be a partial ramp closure at I-840 EB
to SR 1 NB, bottom of ramp, to repair/replace damaged concrete. Ramp will remain open.
WILSON COUNTY I-840
On-Call Pavement Testing
 6/11 & 6/13, 8 p.m. – 5 a.m., temporary lane closures for pavement testing
DAVIDSON COUNTY SR 1
Replacement of Broadway Bridge
 Continuous: A permanent traffic switch on SR 1 (Broadway) between 10th Ave S and 12th Ave S for
bridge demolition reduces the bridge down to 2 lanes in each direction and a single pedestrian
path across the bridge.
 6/12 – 6/14, 8 p.m. – 5 a.m., (excluding Sat. and Sun.) There will be a double right lane closure on
SR-1 (Broadway) EB between 10th Ave S and 12th Ave to continue bridge demolition.
 LOOK AHEAD: 6/19 at 8 p.m. continuously until 6/23 at 5 a.m., Broadway/SR 1 will be fully closed
between 10th Ave S and 12th Ave for bridge construction (weather dependent).
DAVIDSON COUNTY SR 45
The resurfacing on SR 45 (OHB) from SR 65 (Whites Creek Pike) to U.S. 41 (U.S. 31W, SR 11, Dickerson
Pike)
 Daily, 9 a.m. – 3 p.m., excluding Sun., There will be lane closures on Old Hickory Blvd. from Whites
Creek Pike to Dickerson Pike for clipping shoulders, milling and paving and temporary striping.
DAVIDSON COUNTY SR 112
SR 112 (US 41A/Clarksville Pike) from SR 12 (Ashland City Highway) to SR 155 (Briley Pkwy.)
 Daily, 9 a.m. – 3 p.m., There will be a temporary alternating lane closure on SR 112 Clarksville Pike
in both directions for grade work, paving, installation of storm drainage, sanitary sewer, installation
of water line, underground communications and overhead power. Courtney Avenue, Kings Lane,
West Hamilton Lane and the merging lane to Nashville on Ashland City highway will be closed.

TDOT Region 3 • 6601 Centennial Boulevard • Nashville, Tennessee 37243
Tel: 615-741-7446 • Cell: 615-961-6717 • Email: [email protected]
Flaggers will be utilized.
DAVIDSON COUNTY SR 155
The resurfacing on SR 155 from U.S. 41 (S.R. 1, Murfreesboro Road) (LM 4.30) to near NERR Railroad
underpass (LM 9.00), including bridge expansion joint repair.
 6/12 – 6/14, 8 p.m. – 5 a.m., There will be alternating lane closures on SR 155 from SR 1 to near the
NERR Railroad underpass for milling.
DAVIDSON COUNTY SR 255
The grading, drainage, construction of bridges, retaining walls and paving on I-40 (MM 216) at the
Donelson Pike interchange
 Daily, 9 a.m. – 3 p.m., excluding weekends There will be intermittent shoulder closures on SR-255
(Harding Place) NB and SB for survey work at the I-24 interchange. Traffic control will be provided
by Superior Traffic Control.
DAVIDSON COUNTY SR 265
The improvement of the intersection on SR 45 (Old Hickory Blvd) at SR 265 (Central Pike), including
grading, drainage, paving, retaining wall and signals.
 Daily, 9 a.m. – 3 p.m., excluding weekends, there will be alternating lane closures on Central Pike
at the intersection of Old Hickory Blvd.; there will be a closure of the southbound turning lane on
Old Hickory Blvd, to westbound Central Pike, for saw cutting, sidewalk, retaining wall and curb &
gutter installation.
HOUSTON COUNTY SR 49
SR 49 Bridge Replacement over Wells Creek
 6/8 – 6/17 continuously – SR 49 will be closed at Wells Creek. No traffic will be allowed to cross the
bridge and will be detoured to alternate routes. Once weekend work is completed, Dement crews will
re-open the bridge to all traffic.
MAURY COUNTY SR 396
Interchange ramp improvements at Kedron Rd in Spring Hill
 6/11 – 6/14, 6 P.M. – 6 A.M., There will be ramp closures at Kedron Rd to set temporary barrier rail.
Ramp will be reopened every morning.
MONTGOMERY COUNTY SR 112 / SR 76
Intersection Improvements. Grading, Drainage and Construction of Retaining walls.
 Daily, 9 a.m. – 3 p.m., There will be temporary lane closures for final pavement at various locations
throughout the project.
RUTHERFORD COUNTY SR 99
The grading, drainage, construction of retaining walls, signals and paving on SR-99 (New Salem Hwy)
from near I-24 to SR-96 (Old Fort Pkwy)
 Continuous, Bridge Avenue will be closed for utility relocation. A signed detour will be in place.
 6/11 – 6/14, 8 p.m. – 5 a.m., There will be nighttime flagging operations for open cut installation of
utility casing.

TDOT Region 3 • 6601 Centennial Boulevard • Nashville, Tennessee 37243
Tel: 615-741-7446 • Cell: 615-961-6717 • Email: [email protected]
RUTHERFORD COUNTY SR 266
The grading, drainage, construction of two concrete bulb tee beam bridges, signals, and paving on
SR-266 (Jefferson Pike) from SR-102 (LM 5.0) to E. of I-840 (LM 9).
 Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.
SUMNER COUNTY SR 6
LPLM: City of Gallatin Sidewalks
 Daily, 9 a.m. – 3 p.m., Temporary Lane closures for grading, drainage installation and sidewalk
installation
WILLIAMSON COUNTY SR 96
Grading, drainage, construction of bridges and signals on SR 96 from east of Arno Rd (LM 14.72) to SR
252 (Wilson Pk) (LM 20.62).
 Daily, 9 a.m. – 3 p.m., There will be lane closures and brief stoppages of traffic for traffic control
and grading operations.
WILLIAMSON COUNTY SR 100
The resurfacing on S.R. 100 from the Hickman County line (L.M. 0.00) to E of Deer Ridge Rd. (L.M.
3.00)
 6/13 & 6/14, 9 A.M. – 4 P.M., There will be a lane closure for paving operations.
WILLIAMSON COUNTY SR 106
I-65 Interchange at Buckner Road
 Daily, 9a.m. – 3 p.m., excluding Sun., There will be intermittent flagging operation on Lewisburg
Pike (SR 106) from LM 3.7 to LM 4.0 for construction activities.
Scheduled Maintenance Work
DAVIDSON COUNTY I-24
Mill and Fill as Needed
 6/14, 9 a.m. – 3 p.m., Various lane closures and shoulder closed as needed (MM 32-63).
DAVIDSON COUNTY I-40
Mill and fill as needed
 6/13 – 6/14, 8 p.m. – 5 a.m., One EB lane closed for milling and paving. (MM 192 – 193)
RUTHERFORD COUNTY I-840
Pothole patching via milling and paving
 Daily, 9 a.m. – 3 p.m., There will be a lane closure of Lane 2 on I-840 WB near the Wilson County
line for milling and paving operations. Lane 1 will remain open at all times. (MM 64-65)
WILSON COUNTY I-840
Milling and Paving
 6/13, 8 p.m. – 5 a.m., A Right lane closure for Milling operations
 LOOK AHEAD: 6/15, 8 p.m. – 5 a.m., A Right lane closure for Milling operations

TDOT Region 3 • 6601 Centennial Boulevard • Nashville, Tennessee 37243
Tel: 615-741-7446 • Cell: 615-961-6717 • Email: [email protected]
DAVIDSON COUNTY SR 155
Repairing bridge joint
 6/9 at 8 p.m. continuously until 6/12 at 6 a.m., The entrance ramp for Briley Pkwy North from
Centennial Blvd and the Briley Pkwy Exit 26B off ramp will be closed all weekend.

Please Join Our FREE Newsletter!